300 kW Wood Waste Burning Equipment
Panel Processing
Ranheat supplied and installed an MSU 300 kW biomass boiler with a newly designed 60kW economiser to produce a total output of 360kW. We also supplied a 50 m3 conical bottom silo, 4m diameter, twin rotary valves and transport screw. The installation was made in November 2012.
Ranheat also supplied and installed 3 Sabiana unit heaters in the factory unit to include heating pipes to connect to the heaters all complete with control panels.
Two heat meters were also fitted to comply with requirements for the RHI Scheme.